Dear all,
Is it possible to schedule a 40 Work Processes job to run on 2 SAP instances (DIA) only, while the SAP system has 6 SAP instances (CI + 5DIA).
We are using Control M + CPS Redwood.
I suppose some RZ12/Logon groups or SM61 would be involved? Or any concrete trick in CPS/ Control M?
Thanks in advance!
Marian