Hi
I have a scenario and I bet many would have faced the same issue to. However, I am not sure of a solution for this.
Scenario:
I have a Job Chain - JC_Load_Chain which is scheduled to run 10 PM everyday. This chain has been chosen with a 'Job Group Presubmit Count' = 2 in the Submit Frame window.
So if we will see this job at 8 PM today, we would see one schedule at 10 PM Today and another schedule 10 PM Tomorrow.
Let us say, the queue for this chain is held at 9 PM today for a Source System outage. Now the status of the above two mentioned scheules with turn to "Queue Held" status.
The outage is going to exist until 11 PM of tomorrow, which really means, once the Queue is released, both the above mentioned jobs are going to get released and there is going to be a double run.
How should we avoid this situation?
My expectation is, just no matter what if the 10 PM is crossed, I don't want it to run even. It should simply be cancelled.
Please help with your inputs
Thank You
Ganesh Sampath