Hello,
I have a job chain where in the first step is a ABAP-Job with different parameters (e.g. SAP-System) fifteen times.
In the prerunning action I rename the jobs like SAP-System + "_" + Jobname.
While the job chain is only scheduled I cannot differ the jobs. So it is difficult to identify a job who e.g. should be canceled one time.
Is it possible to change the job name when the job chain will be scheduled? Is there another possibility to differ the jobs without expanding the parameters?
Best regards
Dana