Hi Experts
We created Job Chain to trigger two process chain as per below:
Job chain includes 4 steps in step 1 we used RSI_RUN_BW_CHAIN to execute PC1 with two post condition if step 1 completes it goes to step 2 based on post condition settings, In step 2 we were checking status of Process of chain through script RSI_BW_CHAIN_GETSTATUS, we are checking status of this second step based on step2 post conditon settings if this completes it should trigger second process chain as per step1 and step 2
Issue: job chain is completed successfully for all four steps but its triggering both process chain one after another without checking and ensuring first process chain is completed or not, meanwhile if any of process chain is failed its not getting updated in redwood log details
Please correct me if I am missing anything or any other steps need to be included, let me know if more information can be provided
Thanks,
Dhanunjaya U
BI Consultant