Hi Experts,
SAP CPS Job chain is displaying logs for each of the steps in SAP system. Is there a parameter to pass so as the log is displayed just once having all steps as in SM37? Please note Job chain was imported from SAP.
Immediate reply will be of great help.
Thanks
Peter