Redwood Wait Events

$
0
0

Hi,

 

I have configure a job with 3 wait events as the conditio but currently the job is trigger if one of those wait event is raised but i need all the wait event to be raised then only the job should be trigger to run. Any thought on this?

 

 

Regards,

Chris