Hi,
I have four (4) Job Chains, and I would like all four to start (may be together), but independently (means, If one fails or any part of one fails the other chains should not stand still) with one push of a button (scheduled or on-demand).
Should I create an "Event" and add that Event to all four Job Chain's "Wait Event" area, and when ever I want to run, I should manually "Raise Event" so all will start?
Job Chain 1 = (Job 1.1 - Job 2.1 - Job 3.1 - Job 4.1 - Job 5.1 - Job 6.1)
Job Chain 2 = (Job 1.2 - Job 2.2 - Job 3.2 - Job 4.2 - Job 5.2 - Job 6.2)
Job Chain 3 = (Job 1.3 - Job 2.3 - Job 3.3 - Job 4.3 - Job 5.3 - Job 6.3)
Job Chain 4 = (Job 1.4 - Job 2.4 - Job 3.4 - Job 4.4 - Job 5.4 - Job 6.4)
Please let me know what would be the best solution.
Thank you,
Junoon